Title search: ✖
Show All (90)
Activities (9) Business (1) Cole in the News (8) Engineering (8) Events (16) Projects (7) Talent (10) |
COLE was retained by the Regional Municipality of Halton to provide preliminary and detailed design, construction administration and inspection services from Trafalgar Road and Lawson Avenue to the Oakville Southwest Wastewater Treatment Plant (SW WWTP). The project involved the design and construction of a 5.5 km wastewater trunk interceptor sewer, literally under the Town of Oakville, extending from Trafalgar Road to the Oakville SW WWTP, situated just east of Third Line. The project includes open cut construction on lower Trafalgar to facilitate twinning a 900mm pipe, microtunneling west along Randall and Rebecca Streets and aerial crossing of Sixteen Mile Creek by hanging the pipe under the bridge high overhead the creek. Read all about the Project and Award here. |